Subscribe now & get exclusive bike deals,
new arrivals alerts and pro riding tips!
Cycle green, stay fit, live better.

A B2B TT and triathlon procurement checklist for reviewing model references, documentation, interfaces, and open questions.
A TT or triathlon project should be reviewed as one documented system. Buyers should identify the intended project, shortlist exact models, and request current frame, wheel, interface, included-parts, and documentation evidence before treating a proposed build as confirmed.
Record the target market, buyer type, intended platform, project owner, and the questions that need an answer. Use TT frame options, TT wheel options, and triathlon bikes to create a shortlist. Category placement does not establish that two specific products form a compatible build.
For every shortlisted project, collect current model references, drawings or specification documents where available, approved images, included-parts records, and unanswered interface questions. Keep document dates and revision identifiers with the matching model. The carbon frame compatibility guide can structure review questions but does not answer them for a particular model.
Do not publish or quote a combined configuration until the relevant product reviewer has confirmed the applicable information. Geometry, cockpit, wheel, rim, hub, axle, tire, brake, weight, aero, test, price, MOQ, and delivery statements require current exact-model evidence.
| Review area | What to request | Decision rule |
|---|---|---|
| Model identity | Current frame and wheel references | Do not combine unmatched references |
| Documentation | Current drawings, images, and included-parts records | Record revision date |
| Interface questions | Exact unanswered build questions | Confirm before quoting or listing |
| Sample record | Observed questions and response owner | Keep separate from unverified claims |
No. A category shortlist does not establish compatibility or a combined configuration.
Exact model references, current evidence, clear open questions, and a named approval owner.
Submit the shortlist, project market, and required documentation through the OEM/ODM project enquiry.
