Subscribe now & get exclusive bike deals,
new arrivals alerts and pro riding tips!
Cycle green, stay fit, live better.

A practical sourcing guide for dealers comparing carbon road bike categories, exact-model specifications, OEM options, samples, documentation and project-specific commercial terms.
Carbon road bike sourcing should be evaluated by exact model, configuration, quantity, destination and documentation scope. Before placing an order, ask for the current model specification, quotation, sample plan, commercial terms and written after-sales conditions.
Prices, MOQ, production schedule, payment, warranty, packaging, shipping and documentation are confirmed for the project rather than assumed from a general category description.

Road bikes are not a single procurement category. Dealers can compare aero, lightweight, endurance and all-round platforms, but the final choice should follow the target customer, riding use, fitment requirements and available model documentation.
Aero road projects should be reviewed for cockpit integration, cable routing, wheel and tire compatibility, service access and the current model drawing.
Lightweight or climbing projects should be reviewed for the published frame and fork specification, size range, component interfaces and test documentation. Do not treat a category label or an estimated weight as model evidence.
Endurance projects should be reviewed for fit, stack and reach, tire clearance, comfort-related design notes, rack or fender requirements and serviceability.
All-round projects should be evaluated against the buyer’s market and channel data. A general category description cannot determine the safest inventory mix for every dealer.
Use sample feedback, customer demand and model-level documentation to choose the first SKU mix instead of applying a fixed stock percentage.

A useful quote should make the configuration comparable. Request the complete specification rather than relying on a groupset family name alone.
| Quote field | What the buyer should confirm |
|---|---|
| Frame platform | Exact model, size range, frame/fork/seatpost scope and current revision |
| Groupset | Exact parts, cassette, chainrings, rotors, crank length and supply status |
| Wheels and tires | Rim, hub, axle, tire, tube/tubeless and compatibility details |
| Finish and branding | Paint reference, decal artwork, logo authorization and sample approval |
| Commercial terms | Quantity, currency, quotation validity, trade term, payment, packaging and destination |
Ask the supplier to identify substitutions, optional components and any item that remains subject to availability. A clear configuration record reduces comparison and production-change risk.
MOQ and schedule are project-specific. They can change with the model, stock status, paint, branding, sample requirements, quantity, season, destination and component availability.
| Order item | Confirm before approval |
|---|---|
| Open-mold frame | Available sizes, current revision, quantity requirement and included parts |
| Complete bike | Full BOM, assembly scope, component availability and packaging |
| Custom paint or branding | Artwork, sample approval, change-control record and applicable quantity |
| Custom geometry or private development | Drawing ownership, milestones, sample gates, tooling scope and commercial agreement |
Request a written schedule that separates sample approval, production, inspection, dispatch, transport and destination handling. Do not publish or rely on a standard number without a current quotation.

A complete wholesale quote should identify the exact model, size range, included frame parts, component list, wheels, tires, finishing kit, finish, decals, packaging, trade term, payment, schedule, inspection and after-sales terms.
Ask for exact part numbers and approved alternatives where relevant. The buyer should be able to see which items are fixed, which are optional and which remain subject to availability before approving production.

Custom paint and branding should be handled as a documented approval process, not as a universal free service. Confirm the artwork, color references, decal files, logo authority, sample approval, change fees, applicable quantity and final inspection standard in writing.
Landed cost depends on the quoted trade term, shipment size, packaging, destination, transport mode, customs classification, duties, taxes, broker fees and inland delivery. Confirm the current details with the supplier, logistics provider and qualified customs adviser for the specific destination.
| Cost item | Project question |
|---|---|
| Trade term | Is the quote EXW, FOB, CIF, DAP or another term, and which costs are included? |
| Packaging | What is packed per carton, how is damage controlled and what documents are supplied? |
| Customs | Which current classification and destination rules apply to the exact goods? |
| Destination handling | Who pays broker, port, inland delivery, tax and inspection charges? |
Do not assume an industry-standard warranty for a wholesale frame or complete bike. Request the current written policy and confirm the covered model, claim window, exclusions, evidence required, replacement process, shipping responsibility, labor treatment and spare-parts availability.
Keep the warranty, after-sales, paint, component-brand and spare-parts terms with the quotation or contract so the buyer can verify which statement applies to the exact order.

What should I request before ordering a carbon road frame?
Request the exact model drawing, size and interface details, included parts, current quotation, MOQ, schedule, payment, packaging, logistics and written after-sales terms.
Can I compare complete-bike quotes by groupset family alone?
No. Compare the complete BOM, wheel and finishing-kit details, component availability, trade term and documentation for the quoted configuration.
How are MOQ and lead time confirmed?
They are confirmed for the exact model, finish, quantity, destination and project scope in the current quotation or contract.
Can Sunremo support branding or OEM/ODM work?
Share the model, artwork, target quantity, market and documentation requirements so the project path can be reviewed and confirmed.
For a model-specific Road sourcing review, send the target model or category, quantity, destination, component configuration, branding needs, packaging requirements and documentation checklist. Sunremo can then confirm the applicable quotation and project terms.
If you are comparing open-mold and private development, see our guide on Open Mold vs Private Mold Carbon Bike Frames.

